79 Todor Alexandrov Blvd., 1303, Sofia
INSTITUTE OF CONFUCIUS - SOFIA SV. KLIMENT OHRIDSKI
building of the year 2016:
IN CATEGORY-BUILDINGS SOCIAL INFRASTRUCTURE
building of the year 2016:
BUILDINGS SOCIAL INFRASTRUCTURE
INSTITUTE "CONFUCIUS" - SOFIA "ST. KLIMENT OHRIDSKI"
"RECONSTRUCTION AND MODERNIZATION OF A SEPARATE PART OF THE GROUND FLOOR OF A FORMER EDUCATIONAL BUILDING ON BLVD." AL. STAMBOLIYSKI ”№ 82, FOR THE PURPOSE OF CREATING A MODEL - CONFUCIUS INSTITUTE - SOFIA “ ST. KLIMENT OHRIDSKI ”
Client: Sofia University "St. Kliment Ohridski"
DESCRIPTION OF THE WORKS PERFORMED ON THE SITE:
Dismantling works on an area of 2272.63 sq.m.
Construction and repair works on a total area of 2348 sq.m.
The existing classrooms have been rebuilt according to the new design and regulatory requirements. The floor is laminate. The ceiling is suspended with modules 60/60 cm. The existing windows have been replaced with PVC with double glazing according to EE project. To the outer wall is placed thermal insulation of 8 cm of cotton wool, covered with plasterboard, in accordance with the EE project.
Library - on two levels with bookshelves and reading places. The floor is made of laminate, mounted on XPS insulation -5 cm. and reinforced screed. The newly built metal structure is secured with fire-resistant gypsum fiberboard and paints according to the PB project.
Multifunctional hall - for conferences, workshops, cultural and sporting events. It is possible to have 99 seats. The floor is made of laminate, mounted on XPS insulation -5 cm. and reinforced screed. The walls were lined with acoustic panels. The ceiling is made of decorative acoustic panels. The existing skylight has been replaced with a new one with automatically opening wings.
HVAC and electrical installations of the whole site.
Access for people with disabilities is provided.